Empress closed game videos
MMP reports it expects to commence initial production in the first quarter of 2022. The mining contractor has been mobilized and preparations are underway for commencement of mining. Further, the processing plant water storage tank and power is connected and available via a 40 mVA transformer. Several items of the modular plant equipment have been fabricated and transported from South Africa to site and are currently undergoing installation. Specifically, the bulk of the earthworks is complete, concrete has been poured for the plant, the CIL tanks have been fabricated and the tailings dam construction is complete. Since closing the Manica royalty at the end of April 2021, Mutupa Mining Processing ("MMP") has completed engineering and procurement and reports construction is well progressed. MANICA GOLD ROYALTY - Construction Underway Please see Altaleys's website ( for further details. As noted by Altaley, contractors and construction have been working at site since July 2021 and multiple site visits have been completed by Empress Royalty in 20. Initial production from Tahuehueto is noted to be near the end of 2021 with ramp-up continuing into the first quarter of 2022. This materially de-risks ramp-up risks and accelerates initial and eventual steady-state production, resulting in silver by-product production, that will be subject to the Empress Royalty silver stream. Prior underground development at Tahuehueto provides about 75% of the initial two years of to-be-mined material or "stoped-out inventory", with the contractor completing underground development for 100% of the stoped-out inventory. MGA is a well known underground mining contractor with extensive experience in Mexico. Altaley has also recently announced that it has engaged MGA as an underground mining contractor. ("Altaley") continues to advance Tahuehueto toward production and recently announced that construction is on time and on budget (see Altaley press release November 2, 2021). Given the time it takes to come back from Monarch Bluff (or wherever you ended up) we simply gave up at this point due to wastedd time and loss of orb.Altaley Mining Corp. We all reported a more or less simultaneous screen freeze and game closure.
Screen froze n just froze and then game closed. We added him to group and when he travelled back to instance gates were open and commenced second attempt. Further, he had not reconnected at the Dynasty entrance, but at Monarch Bluff. Instead of him reconnecting to the instance when he restarted the game, he had been removed from group.His screen just froze and then game closed. Happened to us last night multiple times with multiple different people crashing.Īll crashes happened shortly after adds/pylons appeared.Īll crashes happened in the area directly under the boss platform (ie furthest from gate).
We wiped due to more DC’s our second attempt.Īfter wiping we could not reopen the door to the arena and had to drown ourselves in a nearby puddle to reset the gate (so we could walk through the closed gate again).Īfter this the group had lost interest as it had been well over an hour of trying to get the fight to interact and we were down to 3 people, no tank, and just not caring about the loot. Once we got back the door was still closed but we could re-enter the boss arena. After dying and logging back in I didn’t have the option to respawn in the instance, so I had to run back from Monarch’s (2.7km with a lot of zigzagging) One crash to desktop was long enough for me to die during it. Typically when there was a lot of stuff going on on-screen (dragon attack, orbs summoned, etc). Multiple bugs experienced: 2 hard crash to desktop during the fight. Was able to run this last night and the boss bugged out on us on our second run through.